Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Revision: draft

The original schedule picture is here (Image Removed)

Proposal after the TSC meeting:

(2022-06-07 TSC Agenda and Minutes)

...

 

...

 

...

 

...

 

...

 

...

 

...

 

...

Change Log

...

r1

Image Added

Change Log

DateRevisionEvent / ChangeMilestones Affected
06/14/22r1The TSC approved the schedule.
06/14/22r1

Second draft.

Note: M5 and Sign Off are now merged into a single milestone.  This was discussed at the June 7 TSC meeting.

All
05/10/22
Initial draftAll