Friday The 13th
AttendeesAttendees
Steve Casey
Sl. No. | Topic | Presenter | Notes |
---|---|---|---|
1 | Project Status |
TODO: Create LF-Ticket to setup Jira. | |
2 | Data Status | 3-Approaches:
Tool to emulate failures in K8S cloud. Demo the Cloudstress to stress the K8S cluster, and see if we can create failures of the pods. TODO: Run this tool in Intel-Pod18, and experiment. Data-Source to Failure-Type listing is completed - Failure Prediction using AI/ML in NFV Environments | |
3 | Model Status | Implementation Status.
Data is labelled based on the conditions. This label is used. Before the failure time-steps (60) - 10s for each step. Trying to increase to 300. Casey: Better to do it as the failure-time, rather than before. How many previous time-steps to consider ? Depends on the usecase (Ex: type of the Equipment). 8hrs to 24. | |
4 | AlgoSelection Graph Status | Unsupervised: Working on Gaussian Mixture models. Kanak: Unable to come up with a clear "separation-parameter" at the last level. Jahanavi: |