Anuket Project

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 18 Next »

Attendees 

  1. Walter.kozlowski (Telstra)
  2. Beth Cohen (Verizon)
  3. Frank Brockners (Cisco)
  4. Georg Kunz (Ericsson)
  5. Cédric Ollivier (Orange)
  6. Mark Beierl (Canonical)
  7. Emma Foley (Red Hat)
  8. jie niu (China Mobile)
  9. Lincoln Lavoie  (UNH-IOL)
  10. Sridhar Rao  (Spirent)
  11. Gergely Csatari (Nokia)
  12. Al Morton
  13. Riccardo Gasparetto (Vodafone)
  14. Trevor Cooper (Intel)

Absent (TSC)

  1. Ahmed El Sawaf (STC)

Other Attendees 

  1. David McBride (LF)
  2. Jim Baker (LF)
  3. Trevor Bramwell
  4. zheng wang
  5. Pankaj.Goyal (AT&T)
  6. Ulrich Kleber(Huawei)

Agenda

Time

Topic

Presenters

Notes

5 min

Meeting Administration

10 min
  •  Recruitment: the Ambassador swag and program
Beth Cohen
  • Anuket Ambassadors - overview of the ambassador program: Evangelize Anuket in the industry, help onboard new participants. Similar to the earlier OPNFV ambassador program.  Add name to this page if you are interested in joining program. 
    In case interested, please join the program.
10 min
  • First reflections after LFN D&TF
10min
  • EUAG/Anuket joint discussions
    • Anuket Assured
    • Input into strategic directions
Beth will take an action item to educate the EUAG about the Anuket project and why it is important for the EUAG needs to participate.  After that, the EUAG will be ready for the joint session to discuss the topics that are of mutual interest.  EUAG has about 10-12 people who normally participate.  The joint session only had 3 people from EUAG.
10 min
  • Kali Release progress
    • M4 coming soon
  • Lakelse release progress
    • M1 scheduled for June 29
    • Schedule (approved by TSC on June 1) 
    • Email to tech-leads
    • Risk due to lack of RC workstream leads
    • Release meeting canceled this week due to holiday

Things are moving along for the upcoming Kali release

David McBrideshowed the Lakelse release schedule.  M1 is under review.  No decision to move to GitLab at this point.  Still using GitHub and Jira.  Cédric Olliviernotes that we must keep Jenkins for the testing functions. Will not shutdown Jenkins until at least the end of the next release as it disrupts contributor planning.

There is no validation plan at this point and no template for validate the progress.  Not enough information to create a template overall. For this release, free form approach to see how it all works first.

Cédric Ollivier would take on RC1 and RC2 for the Lakelse release 

5 min
  • Workstream Leads/ Project PTLs standup
    • one or two sentences each, please, written (add to notes) unless discussion needed
      • RA1 Kali – proofreading PR #2484 will be merged today
      • RA1 Lakelse High Level objectives entered into Release worksheet
    • Pod resources evolving
WSLs/PTLs


5 min
  • Status Updates

    • Linux Foundation Lab (Portland) hardware upgrade status
    • LF IT/Infra update: (Aric GardnerTrevor Bramwell)

Trevor Bramwell

@ Aric Gardner


5 min


5 minAOB

Outstanding Action Items

  • Al Morton  Jim Baker Agreement on Industry Impact Metrics from our repos (about 4-5 objective measures)  for technology  - need a support ticket write-up.
  •  
  • No labels