Anuket Project

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 88 Next »

 


 Project Description

The OPNFV testing project (dovetail) intends to define and provide a set of OPNFV related validation criteria that will provide input for the evaluation of the use of OPNFV trademarks. The dovetail project will be executed with the guidance and oversight of the Compliance and Certification committee and work to secure the goals of the C&C committee for each release.

The project intends to incrementally define qualification criteria that establish the foundations of how we are able to measure the ability to utilize the OPNFV platform, how the platform itself should behave, and how applications may be deployed on the platform.

 


Scope

The project intends to define and implement as necessary qualifications that provide a measure of alignment with the overall OPNFV project for hardware, NFV platform, and NFV applications. The qualifications are not intended to be exclusive in nature, but are intended to provide a measure for the community on the maturity and capability of the OPNFV project and related offerings.

The established processes and tools should be derived from available open source components and test cases. Testing should be able to be executed in an automated on-premise process by entities wishing to evaluate their products or services. This may follow a process similar to the global certification forum (GCF) self certification procedures.

 




Initial Goals

The inital scope of the dovetail project for OPNFV is intended to be a set of evaluations that should provide a set of non-exclusive test cases providing a method of identifying the adherence of NFV solutions to the OPNFV projects activities and goals. This should include qualification by execution of a basic set of mandatory test cases focused on proving:

  • "Lab ready" qualification test suites
  • OPNFV feature and interface level testing suitable for Plug-Fest activities.

Additionally the project will define a set of pre-requisites, an execution process and reporting guidelines for running the associated test cases.

1) specify abstract architecture

     An abstract testing architecture provides a general framework within which specific test arrangements should fit in order to perform the specified suite of tests.

2) specify Test Suite Structure

These guidelines are under discussion on the Dovetail test case requirements and structure (draft) .

3) test/use cases plan

- identification of which test cases are to be included;

- identification of which (optional) test cases are not to be included;

- indication of the order in which the tests are to be performed and the relationships between tests

  Use/test cases plan

4) validate test cases

    Test cases  from upstream projects will be validated and work in conjunction with each other as an organic whole. To achieve this goal,  we need bunch of scripts to communicate with these test cases. The scripts can execute the test cases under certain circumstances, and then analysis variety results to make a human-friendly report . 

    Dovetail Test Tool

 

 


Project Links


Meetings

Meetings

Meeting Agenda & Past Minutes:

Link here: Dovetail (for more details, search in tech-discuss mailing list)


Documentation

Descriptionlink
Dovetail Overviewdovetail overview.pptx
Dovetail Tool Userguidedovetail tool userguide
Testsuitestestsuites
Plugfestplugfest
Infra Requirementsdovetail requirements from infra

 


 Etherpad


Useful Links

  • No labels