People Interested to contribute:
Sridhar Rao (Implementation Only)
Target Phase of Cloud-Lifecycle:
Pre-Deployment of VIM (Openstack or Kubernetes)
Cloud Deployment – Real-World Workflow.
- Hardware Delivery.
- Racking / Stacking
- Power On.
- Hardware configuration and (Validation – handled by CIRV-HDV).
- [N/W Configuration]
- Cloud Deployment (Multiple Installer projects - Airship, Triple-O, Fuel, Kuberef, etc.)
Specification
Implementation
Technology:
Ansible
- Ansible Network is in very matured stated.
- Especially true for Tier-1 switch vendors.
- Multiple connections and Numerous Modules
Ansible -Roles:
Verb-First, Vendor-Next
Verbs: Gather Facts and Capabilities (mandatory), Update Firmware (optional), Update Config (Mandatory)
For Each Verb: Multiple Switch Vendor specific ansible tasks.
Input:
Cloud IP-Planning as Input