Anuket Project
2022-05-09- [Anuket RA-1]- Workstream Meeting Agenda and Minutes
Meetings Every Monday at 14:30 UTC
Zoom Meeting link: https://zoom.us/j/99279174971?pwd=eWozNENnYkpLSXdRSzZvblNKVU1wdz09
Attendees:
Name (Organisation) | will incorporate Participant report from Zoom.
Name |
---|
Ildiko(Open Infra) |
Pankaj.Goyal (Microsoft) |
Karine Sevilla (Orange) |
Cédric Ollivier(Orange) |
As a courtesy to your colleagues please mute yourself when in listen mode. Thanks
Antitrust Policy
This meeting is held in accordance with the LFN and GSMA anti-trust policies.
https://r.lfnetworking.org/Antitrust%20Slide.pdf and GSMA Anti-Trust Policy Notice
Agenda and Minutes
- Agenda Bashing
- Release information
- GSMA document structure
- rst conversion status
- Review of PRs in progress
- Review of detailed issues for Moselle
- Next Meetings
- AOB: security table from NIST
NIST security
Information about security controls from Tom Kivlin , Table from CNCF :
Cloud Native Security Controls Catalog - Google Sheets
Action Point Karine: Check if all these controls are covered on RM and RAs documents
And add the reference to this list into documents, CNSWP v1.0, https://www.cncf.io/blog/2020/11/18/announcing-the-cloud-native-security-white-paper/?msclkid=f8208de3cfa511ec920e88b308d9031c
Link to the White paper: https://github.com/cncf/tag-security/blob/main/security-whitepaper/CNCF_cloud-native-security-whitepaper-Nov2020.pdf
Release information
New Moselle Release milestones approved by the TSC on 19th of April
Milestone(Official) | GitHub | Date | Notes |
---|---|---|---|
M1 | 2022-02-01 | Release definition | |
M2 | 2022-03-22 | Scope freeze | |
M3 (Software project only, not for specs) | 2022-05-03 | RC valid. testing | |
M4 | M3 | 2022-05-24 | Content freeze |
M4-s | M4 | 2022-06-07 | Proofreading |
M5 | 2022-06-07 | Release readiness | |
M6 | 2022-06-14 | Sign off |
Moselle Specification Planning Dashboard - RA1
GSMA document structure
Issues to generate the following tables:
- Terminology: switch from "ref" to "include" on RST
- Abbreviation/Acronym: A new table must be created in RST and manually edited, with "include" instruction
- References and bibliography: 2 tables to be created, add the references inside the text manually. Proposal from Pankaj to create 1 RST file with 2 tables(References, Bibliography) with references and numbering in sequence (no redundant number), example here. Start ASAP and finalise during proofreading period.
- Tables of requirements: on traceability column, 3 options : keep only name title on RST, Keep name and links for RST and GSMA, post process to remove links on GSMA → Decision to keep name and links to RTD on GSMA document
RST conversion
First step: md files cleaning is done, PR #2766 merged
RST files are generated and uploaded, PR #2799, merged,
RST cleaning following rst conversion:
- Ch01 and Ch02, PR#2811: reference links fixed → merged
- Ch03, Ch04, PR#2815: reference links fixed , Figures captions, Lines breaks →merged
- Ch05, PR#2817: Addition of backslashes to fix cut words → merged
- Ch02 , PR#2821: Addition of backslashes to fix cut words → merged
- Ch07, PR#2819: duplicated title removed → merged
- Ch08, PR#2820: numbering removed for internal link→ merged
- Ch06, PR#2818: reference links fixed, tables fixed → merged
Tox issues on RST files: PR#2830 -> merged
First start page for all Anuket specs, PR#2845 → merged
Tox added, links modified, tables format modified, PR#2856 → merged
Configuration of figures numbering format, PR#2893 → merged
Ongoing RST : Figures caption and references to figures number, for all chapters
Tables Chapter 2: PR#2911 merged
PR #2926: wrap chap2 tables (continued) → merged
PR#2946: Tables formats, switch to list-table directive → merged
RA1 contributors agree to switch to list-table format, conversion to do for all the tables
All: help needed to format tables: Tables in chapter 2, Pankaj will take care of chapter 2 tables.
During proofreading period, we will change the table format to list-table for the other chapters.
PRs review
PR#2959: tables formats + linkcheck
PR#2962: Link RA Start page (readme or index?)
Issues review
Issue # | Deliverable | Comments |
---|---|---|
2787 | Storage |
Expand the section "Virtual storage" highlighting the storage requirements for workloads and for the infrastructure components. Refer to RM chapter 3. On the "Cloud Topology" section, describe the differences per hosting environments: large DC to edge infrastructures, in conjunction with RM Chapter 3, 3.6.4. Storage scenarios and architecture fit.
Develop on interactions between OpenStack Cinder/Swift and storage backends. Add examples of backend solutions.
|
2732 | Specification references updates |
|
2500 | Edge |
|
2775 | Cloud Topology | Content improvement (issue #2775):
|
2786 | Acceleration |
|
2784 | Hybrid and multi cloud |
|
2776 | Automation |
|
RST conversion |
| |
GSMA doc |
|
For cloud topology, at this stage, we do not see how to add diagram to describe the redundancy models; The redundancy models are already described in topology details.
(Chapter 03: Topology overview, make clearer the redundancy models, eventually with high level diagrams)
Pankaj: Clarification by deletion of titles.
Next meetings
2022-05-16: next meeting
Actions
Name | Action |
---|---|
All | Review PRs |
All | Start providing new content for Moselle |
Joël | To have a look on Storage |
Karine | Write PR to update section on installers and automation |
Pankaj | Write content on edge following RM work |
All | Need to find more contributror on acceleration |
Karine | Check the table on security controls edited by CNCF, add the reference into RM and RAs |
Pankaj | Will take care of chapter 2 tables format |