Anuket Project
2021-08-24 TSC Agenda and Minutes
Aug 24, 2021
Attendees
@Al Morton (AT&T)
@Cédric Ollivier (Orange)
@Sridhar Rao (Spirent)
@Frank Brockners (Cisco)
@Gergely Csatari (Nokia)
@Walter.kozlowski (Telstra)
@Emma Foley (Red Hat)
@Lincoln Lavoie (UNH-IOL)
Saad Alqahtani as proxy for @Ahmed El Sawaf
@Riccardo Gasparetto Stori (Vodafone)
@jie niu (China Mobile)
@Georg Kunz (Ericsson)
@Trevor Cooper (Intel)
@Mark Beierl (Canonical)
@Beth Cohen (Verizon)
Absent (TSC)
Proxy Allocations
TSC AGREED to have Saad Alqahtani serve as proxy for @Ahmed El Sawaf for a duration of 6 weeks (until Sept 14).
Other Attendees
@Scot Steele (Microsoft)
@David McBride(LFN)
@Sandra Jackson (LFN)
@Karine Sevilla(Orange)
@Parth yadav (University of Delhi)
@Ildiko(OIF)
Agenda
Time | Topic | Presenters | Notes |
|---|---|---|---|
5 min | Agenda Bashing Attendance/Quorum (15/15) Approval of previous meeting minutes 2021-08-17 TSC Agenda and Minutes | @Al Morton |
|
5 min | Announcements Registration to ONE Summit is still open: https://events.linuxfoundation.org/open-networking-edge-summit-north-america/ | @Al Morton | |
5 min | Election for the 2022 TSC Membership and Co-chairs + SPC Rep First step is to determine active community members from Sep 4, 2020 to Sep 3, 2021, using the criteria in the Charter. Does the TSC agree on the (dates above) for the eligibility determination? The above does not include GitLab! But there is a ticket to mirror Gitlab activity of DOCS project with gerrit, making the activity visible to Insights in the sufficiently near-term. Eligibility exceptions will be made to the TSC for approval. Election Validity Requirement (charter) | @Al Morton @Sandra Jackson | #Agreed - the TSC agrees to the proposed dates (09/04/20 - 09/03/21) for the active community member query. |
25 min | Release Updates | B-TEAM! @Scot Steele @David McBride | No news on Anuket Assured marketing. Will be announcing this at the ONES Summit. Request for a company to spot light a product/service that is certified. The long gap to M2 - Scope freeze is about to end. Status: RA review Summary: given a limited amount of time, and the fact that RA1 has not changed much since last fall when it was reviewed, the team chose to focus their attention on RA2. This resulted in the generation of several GitHub issues. Status: Done RC readiness Summary: this requires the RC workstream leads to make a statement to the TSC that each RC is ready for validation testing. The latest developments will be included in the testing. RC1 is synced with RA1 and tested in CI at Walliby Release RC2 is continuously tested, but would like to include the next stable release for K8s (1.22? ). The current schedule does not reflect this dependency. WSL asserts that RC1 and RC2 are ready for testing Status: Open RC Coverage Summary: this requires the RC workstream leads to provide to the TSC a mapping of test cases to RA requirements. Status: Open Jira Issues Assigned to Release Summary: this task requires that each software project document the work that they described in their project plan as a set of Jira issues. Currently, only ViNePerf and Barometer show any issues assigned to Lakelse. Kubref has also assigned issues to Lakelese. @Parth yadav is PTL for CIRV and plans to release in Lakelese. Status: Open High Level Issues Listed on Specification Dashboard Summary: this task requires that the specification team list the high level issues on the dashboard. Status: Open Who will update this? WSLs Completion looks like:
Topics for the next Tech Discussion:
X-testing is part of Functest, maintained there as well. @Cédric Ollivier:
|
5 min | Discuss that the golden list of meeting times and links need to be updated. If you are running a meeting, please update the Anuket Meetings page so people can find you. | @Beth Cohen @Scot Steele | Asking all PTLs to review the meetings page and update meeting information, as necessary. This is very important as this is source of truth! |
10 min | Feedback from (re-)introduction of Anuket Assured to EUAG | @Beth Cohen @Lincoln Lavoie |
|
10 min | PTL and WSL Stand-up | @Al Morton and sub-project Leaders |
|
0 min | GitLab update (defer to Aug 31, 2021) "DOCS project to gerrit" request status | @Trevor Bramwell | Deferred to next week. |
0 min | Status Updates Linux Foundation Lab (Portland) hardware upgrade status LF IT/Infra update: (Trevor Bramwell) | @Trevor Bramwell | |
5 min | Technical Officer Updates Tech Editor - @Beth Cohen CNCF Tech Coordination - @Gergely Csatari ETSI NFV and MEC Tech Coordination - @Ulrich Kleber GSMA Tech Coordination - @Walter.kozlowski XGVela Tech Coordination - @Pankaj.Goyal Open Infrastructure Foundation - @Ildiko ORAN - vacancy for WG 6 MEF - @MEHMET TOY | MEF - Strawman for Infra and Edge APIs to MEF. trying not to duplicate efforts. | |
5 min | AOB Discuss open ideas about the structure and topics of the TSC meetings in the future |
|