Anuket Project
2022-05-02- [Anuket RA-1]- Workstream Meeting Agenda and Minutes
Meetings Every Monday at 14:30 UTC
Zoom Meeting link: https://zoom.us/j/99279174971?pwd=eWozNENnYkpLSXdRSzZvblNKVU1wdz09
Attendees:
Name (Organisation) | will incorporate Participant report from Zoom.
Name |
---|
Ildiko (Open Infra) |
Karine Sevilla(Orange) |
Pankaj.Goyal(Microsoft) |
Cédric Ollivier(Orange) |
As a courtesy to your colleagues please mute yourself when in listen mode. Thanks
Antitrust Policy
This meeting is held in accordance with the LFN and GSMA anti-trust policies.
https://r.lfnetworking.org/Antitrust%20Slide.pdf and GSMA Anti-Trust Policy Notice
Agenda and Minutes
- Agenda Bashing
- Release information
- OITF#11 meeting
- GSMA document structure
- rst conversion status
- Review of PRs in progress
- Review of detailed issues for Moselle
- Next Meetings
- AOB
Release information
New Moselle Release milestones approved by the TSC on 19th of April
Milestone(Official) | GitHub | Date | Notes |
---|---|---|---|
M1 | 2022-02-01 | Release definition | |
M2 | 2022-03-22 | Scope freeze | |
M3 (Software project only, not for specs) | 2022-05-03 | RC valid. testing | |
M4 | M3 | 2022-05-24 | Content freeze |
M4-s | M4 | 2022-06-07 | Proofreading |
M5 | 2022-06-07 | Release readiness | |
M6 | 2022-06-14 | Sign off |
Moselle Specification Planning Dashboard - RA1
GSMA OITF#11 meeting
NG.133 v2.0 content presented. It will based on RA1 and RC1 Anuket Moselle release.
The 9th of September is the milestone approved during the meeting to enter into the GSMA process for NG.133 v2.0 publication.
The new Anuket creation of documents was presented and questions to GSMA on the production of the GSMA pdf document.
2 action points are identified on GSMA side (Javier Sendin):
- Can PDF documents be used during the GSMA Review process?
- Get the GSMA PRD Word Template styles corrected (e.g., Normal style)
Next meeting OITF in London 20-23 June: Pankaj will not go, Karine not sure to go, it can be only on Thursday, if any interest.
The meeting will be held in hybrid mode.
GSMA document structure
Issues to generate the following tables:
- Terminology: switch from "ref" to "include" on RST
- Abbreviation/Acronym: A new table must be created in RST and manually edited, with "include" instruction
- References and bibliography: 2 tables to be created, add the references inside the text manually. Proposal from Pankaj to create 1 RST file with 2 tables(References, Bibliography) with references and numbering in sequence (no redundant number), example here. Start ASPA and finalise during proofreading period.
- Tables of requirements: on traceability column, 3 options : keep only name title on RST, Keep name and links for RST and GSMA, post process to remove links on GSMA
RST conversion
First step: md files cleaning is done, PR #2766 merged
RST files are generated and uploaded, PR #2799, merged,
RST cleaning following rst conversion:
- Ch01 and Ch02, PR#2811: reference links fixed → merged
- Ch03, Ch04, PR#2815: reference links fixed , Figures captions, Lines breaks →merged
- Ch05, PR#2817: Addition of backslashes to fix cut words → merged
- Ch02 , PR#2821: Addition of backslashes to fix cut words → merged
- Ch07, PR#2819: duplicated title removed → merged
- Ch08, PR#2820: numbering removed for internal link→ merged
- Ch06, PR#2818: reference links fixed, tables fixed → merged
Tox issues on RST files: PR#2830 -> merged
First start page for all Anuket specs, PR#2845 → merged
Tox added, links modified, tables format modified, PR#2856 → merged
Configuration of figures numbering format, PR#2893 → merged
Ongoing RST : Figures caption and references to figures number, for all chapters
Tables Chapter 2: PR#2911 merged
All: help needed to format tables
PRs review
PR #2926: wrap chap2 tables (continued)
Issues review
Issue # | Deliverable | Comments |
---|---|---|
2787 | Storage |
Expand the section "Virtual storage" highlighting the storage requirements for workloads and for the infrastructure components. Refer to RM chapter 3. On the "Cloud Topology" section, describe the differences per hosting environments: large DC to edge infrastructures, in conjunction with RM Chapter 3, 3.6.4. Storage scenarios and architecture fit.
Develop on interactions between OpenStack Cinder/Swift and storage backends. Add examples of backend solutions.
|
2732 | Specification references updates |
|
2500 | Edge |
|
2775 | Cloud Topology | Content improvement (issue #2775):
|
2786 | Acceleration |
|
2784 | Hybrid and multi cloud |
|
2776 | Automation |
|
RST conversion |
| |
GSMA doc |
|
Next meetings
2022-05-09: next meeting
Actions
Name | Action |
---|---|
All | Review PRs |
All | Start providing new content for Moselle |
Joël | To have a look on Storage |
Karine | Write PR to update section on installers and automation |
Pankaj | Write content on edge following RM work |
All | Need to find more contributror on acceleration |