The weekly meeting takes place on Tuesdays at 17:00 Irish Standard time (UTC+1)
Meeting is held on zoom: https://zoom.us/j/92950950555?pwd=K2tWZWovWXJWTmNuZHIxNGlZWkpHQT09 and IRC #opnfv-meeting.
...
The next meeting takes place on 02 , at 16h00 UTC (17h00 Ireland/Dublin).
Agenda
16-November-2021
2021 Meetings
09-November-2021
- Lakelse update
- M4 is next, which applies to specification projects only
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- https://gerrit.opnfv.org/gerrit/c/barometer/+/73001 will hopefully address these, as the failures both appear to be due to an issue in systems/centos/8/build_base_machine.sh
- TSC Updates
- 2022 TSC Member, Co-Chair, and SPC Representative Elections (Co-chair elections) are underway, nominations close on
- Standards updates
- Thoth
- Action(Emma): Investigate collectd failures on POD-18
2021 Meetings
02-November-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- Action(Emma) to provide docs Scott Steele
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- Both are based on the same Dockerfile (IIRC), with different parameters, so the same fix will likely solve this.
- The issue might also be in all containers, but rebuilding was not triggered for others recently
- TSC Updates
- TSC election has concluded
- Standards updates
- No comments so far from the remote consensus process
- Thoth
- Action(Emma): Investigate collectd failures on POD-18
...
26-October-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- New release names announced
- Moselle
- Nile
- CI status
- TSC Updates
- Nominations are closed and voting is underway for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- Approval process has been started for ETSI NFV GS NFV-TST008ed351 - this remote consensus process lasts for 4 weeks, started yesterday, Monday, October 25.
- Committer clean-up
- Done
- Thoth
- Sridhar requested some help with collectd on POD-18, one instance of collectd was continually restarting and workload migrations aren't being triggered when CPU intensive workloads are run.
- Sridhar outlined a plan to generate workload metrics using GANs since there's a lack of data from large enough clouds.
...
- Lakelse update
- M3 is October 19th
- CI status
- Everything is passing
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- No updates; latest meeting was post-poned
- Committer clean-up
- Process for removing committers:- either a committer steps down voluntarily or can be removed by a 2/3 majority vote.
- Action(Emma) Reach out to Calin about stepping down
2021 Meetings
28-September-2021
- Lakelse update
- CI status
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- A complete working group review of the document is happening, then it will be submitted for full approval.
- Committer clean-up
- Emma did not check the existing process
- Emma e-mailed Aaron about stepping down as a committer - he agreed
- Al e-mailed Maryam about stepping down as committer - she sadly agreed
- Action(Emma): Check the existing process for removing committers;
- Action(Emma) Reach out to Calin about stepping down
...