Anuket Project

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 45 Current »

Zoom link:

https://zoom.us/j/997256543?pwd=MWptM0F0Y1NpckhFVUgrZnM2TkJ0Zz09

Attendees

Please add your name in here:


  • Agenda:
    • Kali Release PRs:
      • PR#2320: "Basic and High Performance Flavor profiles": proposal to to stop working on this PR, and replace it by PR#2384: WK→ discuss with Rodriduez

      • PR#2343: "References to GSMA security documents": merged, branch deleted

      • PR#2347: "Added 3.4.2 Time Sensitive Workloads": proposal to replace by PR#2386 to resolve conflicts.  NOTE: Section 3.5 (Network) has been renumbered by Walter as Admin: CLOSED and replaced by PR#2386

      • PR#2377: "Storage Telemetry Definitions": merged

      • PR#2384: "Rewrite 4.2" replacing PR#2320: Reviews needed
      • PR#2385: "[RM Ch09] Tenant Networking Automation": Reviews/approvals needed (minor)

      • PR#2386: "[RM 3.5.4] Time Sensitive Networking": replacing PR#2347: Reviews/approvals needed (contents the same, but in a different section now)

      • PR#2387: "Virtual Network": referring to 3.5 Network: Reviews/approvals needed (minor)
    • Kali Release Issues:
      • Issue#2067: "Review use-cases that are used for the analysis": Help needed

      • Issue#2135:"[RM Ch03] "Illogical sub chapter order": assigned to Walter.kozlowskiproposal to CLOSE, link → closed by PR#2387

      • Issue#2313: "[RM Ch07] "Zero trust environment": No PRS, need to assigned and resolved
      • Issue#2314: "[RM Ch07] "Multi-Cloud security]: No PRS, need to assigned and resolved 

      • Issue#2315: "[RM Ch07]  "Open source Software]: No PRS, need to assigned and resolved
      • Issue#2316: "[RM Ch07]  "Storage of sensitive data": No PRS, need to assigned and resolved
      • Issue#2317: "[RM Ch07]  "Automation security": assigned to Walter.kozlowski, PR#xxxx (work in progress)
      • Issue#2322: "[GOV][RM] Fix or at least precise backwards compatibility and release support": This Issue refers to Sec 4.2.7.2, where RM talks about backward and forward compatibility of profiles, not about compatibility of releases.  Proposal: to reassign this Issue from RM to TSC (where Release Mgmt is defined)

      • Issue#2328: "[RA2 Ch3.8] Define SyncE requirement": should be closed by PR#2386, Beforing closing, put a reference to SyncE

      • Issue#2334: "[RM][RA1][RA2] Streamline names of flavours": should be closed by PR#2384

      • Issue#2352: "[RM Common] Common - Technical Policies": assigned to Walter.kozlowski, PR#xxxx (work in progress)

      • Issue#2353: "[RM Ch03] SFC Section 3.5.1 Architecture": proposes to add an ER diagram: assigned to Kumar Sumangit, need to raise PR and include the diagram

      • Issue#2354: "[RM Ch02] Workload Profiles": assigned to Pankaj.Goyal: umbrella issue for Issues 2366 and 2368

      • Issue#2365: "[RM Ch04] 4.3 Networking Section doesn't belong in Chapter 4": proposal: Move it under 3.5 "Network". See: https://github.com/cntt-n/CNTT/blob/pgoyal01-RM-patch-Ch-4-2/doc/ref_model/chapters/chapter04.md for the new context, also possible changes to Chapter 5 because of repetitions in new Chapter 4, Tomas → advise about moving 4.3 into 3.5, or creating a separate Chapter

      • Issue#2366: "[RM Ch04] Align RM 4.2 with Chapter 02 - Node & Workload Profiles": assigned to Pankaj.Goyal, should be resolved by PR#2384: "Rewrite 4.2"

      • Issue#2368: "[RM Ch05] Modify 5.1 and 5.2 around Workload Profiles and Workload Flavours"Need to be resolved after PR#2384 is done

      • Issue#2369: assigned to Riccardo Gasparetto: "[RM Ch02] 2.4.2 Node Flavours align with updates to RM Section 4.2": No PRS, need to assigned and resolved, relation to Issues#2366, 2354, 2368?

      • Issue#2388: "[RM Chxx] Alignment to NG.126 2.0 reg Appendix A": assigned to Walter.kozlowski

      • Issue#2389: "[RM Chxx] Alignment to NG.126 2.0 reg Appendix B": assigned to Walter.kozlowski

Anuket Kali release milestones: 

M0Start of release

 


M1Release planning

 


M2Scope Freeze

 


M3Content Freeze

 


M4Proofreading

 


M5Release Readiness

 


M6Release

 


Actions:


Minutes:

  • No labels