Anuket Project

Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 12 Next »

Zoom link:

https://zoom.us/j/997256543?pwd=MWptM0F0Y1NpckhFVUgrZnM2TkJ0Zz09

Attendees

Please add your name in here:


  • Agenda:
    • Storage:  discussion was led by John Hartley.  As an outcome, John is planning to:
      • Review RA-1 and Ra-2 storage contents to plan a consistent storage story across these three specs
      • Comments directed to the storage story to be: application and use case driven, conceptual rather than technology specific
      • Create detailed GitHub issues following form an overall Issue #2056; these issues will (after discussion and approval of RM meeting) create the scope for Lakesle
    • Automation for Cloud Infrastructure: discussion led by Saad. As an outcome, Saad is planning to:
      • Review the proposed contents against the existing specs (RA-x, RC-x)
      • Clarify what aspects are specific to IaC vs general CI/CD pipeline (which generally would be out of the Anuket scope)
      • Clarify delineation between VNF/CNF and Network layers, as per the discussion at the meeting
      • Present the updated contents for further discussion and acceptance by the RM meeting, which will allow creation of respective GitHub Issues to define the Laksle scope for this topic
    • Semantic Networking: discussion led by Per. As an outcome, Per is planning to:
      • Move the contents of PR#2546 to RA-2
      • Create a new Issue/PR for RM to discuss the topic on a conceptual level (not on K8s level) as an introductory material for the RA-2 detailed K8s discussion.
    • Hardware Acceleration: discussion led by Petar.  As an outcome, Petar is planning to:
      • Align/map our contents (especially in and around diagram Fig 3-17) to the model discussed in ORAN O-RAN.WG6.AAL-GAnP-v01.00.pdf (especially around ORAN's Acceleration Layer concept)
    • Multi-cloud: discussion postponed to the next RM meeting due to the lack of time

Actions:

Decisions:


Minutes:


  • No labels