Revision: r2
Change Log
Date | Revision | Event / Change | Milestones Affected |
---|---|---|---|
08/02/22 | r2 | Corrected copy-and-paste error on schedule | None |
06/14/22 | r1 | The TSC approved the schedule. | All |
06/14/22 | r1 | Second draft. Note: M5 and Sign Off are now merged into a single milestone. This was discussed at the June 7 TSC meeting. | All |
05/10/22 | Initial draft | All |