The next meeting takes place on 16 , at 16h00 UTC (17h00 Ireland/Dublin).
Agenda
...
23-November-2021
- Lakelse Updates
- M4 is up today, which applies to specification projects
- There was a discussion on moving the release schedule so Lakelse finishes laterRelease will be early next year
- CI status
- Everything is passing!
- TSC updates
- Elections are underway for TSC co-chairs: 2022 TSC Member, Co-Chair, and SPC Representative Elections
- Standards updates
2021 Meetings
09-November-2021
- Lakelse update
- M4 is next, which applies to specification projects only
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- https://gerrit.opnfv.org/gerrit/c/barometer/+/73001 will hopefully address these, as the failures both appear to be due to an issue in systems/centos/8/build_base_machine.sh
- TSC Updates
- 2022 TSC Member, Co-Chair, and SPC Representative Elections (Co-chair elections) are underway, nominations close on
- Standards updates
- Thoth
- Action(Emma): Investigate collectd failures on POD-18
02-November-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- Action(Emma) to provide docs Scott Steele
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- Both are based on the same Dockerfile (IIRC), with different parameters, so the same fix will likely solve this. The issue might also be in all containers, but rebuilding was not triggered for others recently
- TSC election has concluded
- No comments so far from the comment; remote consensus process
- Action(Emma): Investigate collectd failures on POD-18
26-October-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- New release names announced
- Moselle
- Nile
- CI status
- TSC Updates
- Nominations are closed and voting is underway for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- Approval process has been started for ETSI NFV GS NFV-TST008ed351 - this remote consensus process lasts for 4 weeks, started yesterday, Monday, October 25.
- Committer clean-up
- Done
- Thoth
- Sridhar requested some help with collectd on POD-18, one instance of collectd was continually restarting and workload migrations aren't being triggered when CPU intensive workloads are run.
- Sridhar outlined a plan to generate workload metrics using GANs since there's a lack of data from large enough clouds.
19-October-2021
- Lakelse update
- M3 is
- CI status
- TSC Updates
- Nominations are closed and voting is underway for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- ETSI standard was approved at the working group level today; next step: remote consensus
- Committer clean-up
- Review up for Aaron and Calin: https://gerrit.opnfv.org/gerrit/c/barometer/+/72964
12-October-2021
- Lakelse update
- M3 is October 19th
- CI status
- TSC Updates
- Nominations are open for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- Committer clean-up
- Review up for Aaron and Calin: https://gerrit.opnfv.org/gerrit/c/barometer/+/72964
05-October-2021
- Lakelse update
- M3 is October 19th
- CI status
- Everything is passing
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- No updates; latest meeting was post-poned
- Committer clean-up
- Process for removing committers:- either a committer steps down voluntarily or can be removed by a 2/3 majority vote.
- Action(Emma) Reach out to Calin about stepping down
28-September-2021
- Lakelse update
- CI status
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- A complete working group review of the document is happening, then it will be submitted for full approval.
- Committer clean-up
- Emma did not check the existing process
- Emma e-mailed Aaron about stepping down as a committer - he agreed
- Al e-mailed Maryam about stepping down as committer - she sadly agreed
- Action(Emma): Check the existing process for removing committers;
- Action(Emma) Reach out to Calin about stepping down
21-September-2021
...
- M3 is (Lakelse Schedule)
...
- Containers to be uploaded to anuket dockerhub
- https://gerrit.opnfv.org/gerrit/c/barometer/+/72916
...
- Looking good
...
- closed; Document number updated to NFV(21)000243, and it's now considered "done"; expected actions from editors to update style and references;
2021 Meetings
16-November-2021
- Lakelse Updates
- M4 is up today, which applies to specification projects
- There was a discussion on moving the release schedule so Lakelse finishes later
- CI status
- Everything is passing
- TSC updates
- Elections are underway for TSC co-chairs: 2022 TSC Member, Co-Chair, and SPC Representative Elections
...
- Some minor revision is needed
...
- https://gerrit.opnfv.org/gerrit/c/barometer/+/72915/1/INFO.yaml#34
- Action(Emma): Check the existing process for removing committers;
- Action(Al): ping Maryam to step down
31-August-2021
- Lakelse updates
- Today is M2 - scope freeze
- CI status
- Standards updates
- The ETSI-NFV test working group accepted the contribution on storage!
- AoB
24-August-2021
- Lakelse updates
- Need to add Lakelse labels to Jira items
- CI status
- Standards updates
- Updated draft of TST-008 to include storage metrics
- AoB
17-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 2 weeks.
- Ci status
- No status change
- Standards updates
- no status change
- AoB
10-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 3 weeks.
- Ci status
- Everything looks fine (some older jobs are failing, but that's nothing to worry about)
- Standards updates
- No updates
- AoB
03-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 4 weeks.
- Ci status
- barometer-daily-master is working again!
- Thoth, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- Thoth project got approved at this week's TSC!
- AoB
13-Jul-2021
- Announcement: Meetings are cancelled the next two weeks for vacation time
- Lakelse updates:
- M2 (scope freeze) is
- Ci status: barometer-daily-master is mostly working; there's an issue in uploading the artifacts, I've logged a ticket to get it investigated.
- Gitlab transition:
- ETA is mid-August
- AI/ML project, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- AoB
06-Jul-2021
- Kali updates:
- Anuket Kali was released https://docs.opnfv.org/en/stable-kali/
- Lakelse updates:
- M1 passed last week: Barometer Lakelse Release Planning document submitted
- M2 (scope freeze) is
- Ci status
- The barometer-daily-master job is stalled; Fixed - there was a temporary shutdown to troubleshoot another failure.
- Barometer slack channel
- Gitlab transition: When is it happening?
- Everyone needs a gitlab account to contribute to anuket on gitlab
- Can then get added to the gitlab.
- No definitive date yet for transitioning to gitlab.
- Open question on what permissions/roles need to be set up before transition
- AI/ML project, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- AoB
Older meetings
The weekly meeting takes place on Tuesdays at 17:00 Irish Standard time (UTC)
Meeting is held on zoom: https://zoom.us/j/92950950555?pwd=K2tWZWovWXJWTmNuZHIxNGlZWkpHQT09 and IRC #opnfv-meeting.
Table of Contents |
---|
Standing agenda items
- TSC updates
- Release updates
- Action item review
Next meeting
The next meeting takes place on , at 16h00 UTC (17h00 Ireland/Dublin).
Agenda
16-November-2021
- Lakelse Updates
- CI status
- TSC updates
- Standards updates
...
09-November-2021
- Lakelse update
- M4 is next, which applies to specification projects only
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- https://gerrit.opnfv.org/gerrit/c/barometer/+/73001 will hopefully address these, as the failures both appear to be due to an issue in systems/centos/8/build_base_machine.sh
- TSC Updates
- 2022 TSC Member, Co-Chair, and SPC Representative Elections (Co-chair elections) are underway, nominations close on
- Standards updates
- Thoth
- Action(Emma): Investigate collectd failures on POD-18
02-November-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- Action(Emma) to provide docs Scott Steele
- CI status
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-latest-docker-build-push-master/ - failing
- https://build.opnfv.org/ci/view/barometer/job/barometer-collectd-experimental-docker-build-push-master/ - failing
- Both are based on the same Dockerfile (IIRC), with different parameters, so the same fix will likely solve this.
- The issue might also be in all containers, but rebuilding was not triggered for others recently
- TSC Updates
- TSC election has concluded
- Standards updates
- No comments so far from the remote consensus process
- Thoth
- Action(Emma): Investigate collectd failures on POD-18
26-October-2021
- Lakelse update
- M3 is
- preliminary documentation needs to be completed
- New release names announced
- Moselle
- Nile
- CI status
- TSC Updates
- Nominations are closed and voting is underway for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- Approval process has been started for ETSI NFV GS NFV-TST008ed351 - this remote consensus process lasts for 4 weeks, started yesterday, Monday, October 25.
- Committer clean-up
- Done
- Thoth
- Sridhar requested some help with collectd on POD-18, one instance of collectd was continually restarting and workload migrations aren't being triggered when CPU intensive workloads are run.
- Sridhar outlined a plan to generate workload metrics using GANs since there's a lack of data from large enough clouds.
19-October-2021
- Lakelse update
- M3 is
- CI status
- TSC Updates
- Nominations are closed and voting is underway for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- ETSI standard was approved at the working group level today; next step: remote consensus
- Committer clean-up
- Review up for Aaron and Calin: https://gerrit.opnfv.org/gerrit/c/barometer/+/72964
12-October-2021
- Lakelse update
- M3 is October 19th
- CI status
- TSC Updates
- Nominations are open for the 2022 TSC Member, Co-Chair, and SPC Representative Elections, will close on
- Standards updates
- Committer clean-up
- Review up for Aaron and Calin: https://gerrit.opnfv.org/gerrit/c/barometer/+/72964
05-October-2021
- Lakelse update
- M3 is October 19th
- CI status
- Everything is passing
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- No updates; latest meeting was post-poned
- Committer clean-up
- Process for removing committers:- either a committer steps down voluntarily or can be removed by a 2/3 majority vote.
- Action(Emma) Reach out to Calin about stepping down
28-September-2021
- Lakelse update
- CI status
- TSC Updates
- Nominations are open for the 2022 TSC memberships
- Standards updates
- A complete working group review of the document is happening, then it will be submitted for full approval.
- Committer clean-up
- Emma did not check the existing process
- Emma e-mailed Aaron about stepping down as a committer - he agreed
- Al e-mailed Maryam about stepping down as committer - she sadly agreed
- Action(Emma): Check the existing process for removing committers;
- Action(Emma) Reach out to Calin about stepping down
21-September-2021
- Lakelse update
- M3 is (Lakelse Schedule)
- Anuket container images
- Containers to be uploaded to anuket dockerhub
- https://gerrit.opnfv.org/gerrit/c/barometer/+/72916
- Ci status
- Looking good
- TSC updates
- Anuket Active Community Members - 2022 list needs review/update
- Nominations are open for 2022 TSC Member, Co-Chair, and SPC Representative Elections
- Release naming suggestions are open: Release Name Selection
- Standards updates
- Some minor revision is needed
- Committer clean-up
- https://gerrit.opnfv.org/gerrit/c/barometer/+/72915/1/INFO.yaml#34
- Action(Emma): Check the existing process for removing committers;
- Action(Al): ping Maryam to step down
31-August-2021
- Lakelse updates
- Today is M2 - scope freeze
- CI status
- Standards updates
- The ETSI-NFV test working group accepted the contribution on storage!
- AoB
24-August-2021
- Lakelse updates
- Need to add Lakelse labels to Jira items
- CI status
- Standards updates
- Updated draft of TST-008 to include storage metrics
- AoB
17-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 2 weeks.
- Ci status
- No status change
- Standards updates
- no status change
- AoB
10-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 3 weeks.
- Ci status
- Everything looks fine (some older jobs are failing, but that's nothing to worry about)
- Standards updates
- No updates
- AoB
03-August-2021
- Lakelse updates:
- M2 (scope freeze) is
- Discussions/triaging/scoping of RA reqs into to Jira items is taking place in the Release meeting for the next 4 weeks.
- Ci status
- barometer-daily-master is working again!
- Thoth, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- Thoth project got approved at this week's TSC!
- AoB
13-Jul-2021
- Announcement: Meetings are cancelled the next two weeks for vacation time
- Lakelse updates:
- M2 (scope freeze) is
- Ci status: barometer-daily-master is mostly working; there's an issue in uploading the artifacts, I've logged a ticket to get it investigated.
- Gitlab transition:
- ETA is mid-August
- AI/ML project, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- AoB
06-Jul-2021
- Kali updates:
- Anuket Kali was released https://docs.opnfv.org/en/stable-kali/
- Lakelse updates:
- M1 passed last week: Barometer Lakelse Release Planning document submitted
- M2 (scope freeze) is
- Ci status
- The barometer-daily-master job is stalled; Fixed - there was a temporary shutdown to troubleshoot another failure.
- Barometer slack channel
- Gitlab transition: When is it happening?
- Everyone needs a gitlab account to contribute to anuket on gitlab
- Can then get added to the gitlab.
- No definitive date yet for transitioning to gitlab.
- Open question on what permissions/roles need to be set up before transition
- AI/ML project, possible demo/collab, discussion on the weekly tech discuss and weekly AI/ML meeting.
- AoB