Anuket Project
2021-01-13 - [Anuket Reference Model Workstream] Agenda and Meeting Minutes
Zoom link:
https://zoom.us/j/997256543?pwd=MWptM0F0Y1NpckhFVUgrZnM2TkJ0Zz09
Attendees:
Please add your name in here:
- Walter Kozlowski (Telstra)
- Suresh Krishnan (Kaloom)
- Tomas Fredberg (Ericsson)
- Beth Cohen (Verizon)
- Tom Van Pelt (GSMA)
- Pankaj Goyal(AT&T)
- Petar Torre (Intel)
- Sukhdev Kapur (Juniper Networks)
- Karine Sevilla (Orange)
- Per Andersson (Kaloom)
- Toshiyasu Wakayama (KDDI)
- Ahmed El Sawaf
Agenda:
- Agenda
- Updates on current activities
- Next vF2F conference in February 2021: topics are required: Feb vF2F Feb 1-4: 2021 February LFN Developer & Testing Forum. Proposals due 15 January 2021. Put in the topic proposals here: 2021 February Developer Topic Proposals. Topics already done (as placeholders), need descriptions:
- Hybrid, multi-cloud model: DC to Edge (Pankaj, Walter)→ Pankaj to add add description
- Acceleration Abstraction (Petar, Tomas, Per) → Petar add description
- Beyond IaaS/CaaS for Cloud Infrastructure in RM (Petar, Pankaj, Walter) → Pankaj to add description
- Telemetry, monitoring, observability (Sukhdev, Petar, Zlatko) → Sukhdev to add description
- Edge (Beth, Ahmed) → Beth to add description
- Proposal: Introduction to Anuket → Beth to add
- All→ please add other topics if you want to present: F2F Org Committee already working - Beth, Scot Steele, Emma Foley, meeting tomorrow. Beth to coordinate for RM group
Next release (Elbrus)
- CNTT Elbrus Release Cycle
- M3 Contents Freeze: 15 January 2021,
- M4 Proofreading Freeze: 22 January 2021
- M5 Release Candidate : 26/01
- M6 Release Signoff: 29/01
Network/Hardware Management Hardware Infrastructure Management: function and APIs Tomas, Walter HighElbrus MVP PR#2144 approved, merged Primary & secondary networking Tomas, Suresh, Gergely MediumElbrus MVP PR#2155 approved, merged Operations Security (workloads and infrastructure) - alignment with ONAP Karine, Amy, Pankaj Closed for Elbrus Done from Elbrus MVP perspective
Karine reviewing FS.31 and FS.40 from GSMA FASG from the possible alignment perspective for post Elbrus
Operations and Life-cycle Management Closed for Elbrus PR#2129 approved, mergedContents in Sec 9.5Missing contents for 9.5.1 Infrastructure LCM Automation - post_ElbrusAutomation (closed loop automation) Closed for Elbrus Gap 10.3.6 raised in Chapter 10
Observability/telemetry Sukhdev, Zlatko, Petar Closed for Elbrus Sec 9.6 Acceleration Hardware acceleration abstraction Petar, Tomas, Per, Walter Closed for Elbrus Sec 3.8 Storage Karine, Petar Closed for Elbrus Work in progress on structure Special use cases Load balancing Per, Sukhdev Closed for Elbrus Sec 10.3.2 (gap defined) Mutual discovery (workloads/infrastructure) Sukhdev, Tomas Closed for Elbrus Sec 10.3.1 (gap defined) Service function chaining Suresh, Sukhdev Closed for Elbrus Sec 3.5.1 Model for Enterprise Cloud and Edge Walter, Pankaj, Ahmed Closed for Elbrus Chapter 8 Alignment with ONAP Investigate topics other than security Petar Ongoing Petar to present to RM meeting Alignment with GSMA OPG Investigate alignment points Walter Ongoing Depends on outcomes of joint OITF and OPG meetings Alignment with ORAN? Influence ORAN regarding telco cloud Ongoing Tomas raised this question as he participates in WG 6. Karine to find out how we could discuss possible dependencies, alignments, cloud principles.... Alignment with ODIM Martin Ongoing Bring to this meeting the actions, comments from previous sessions and vF2F Granularity of RM profiles Ongoing Issue 2068Ricardo as the new RA-2 leader has joined RM meetings R2view of RM Chapter 2 use cases All Ongoing Issues 2067 Actions:
Minutes:
- GSMA non-members who want to participate in OITF please contact Tom Van Pelt , tpelt@gsma.com. Those who are interested in GSMA PRD FS.31 - it is available at https://www.gsma.com/security/resources/fs-31-gsma-baseline-security-controls/
- Cloud Native Network Functions (CNF) Working Group: https://github.com/cncf/cnf-conformance/pull/450