Anuket Project
2022-01-18 TSC Agenda and Minutes
Attendees
- Beth Cohen (Verizon, Co-Chair)
- Al Morton (AT&T)
- Georg Kunz (Ericsson)
- Scot Steele(Microsoft)
- Gergely Csatari (Nokia, Co-Chair)
- Riccardo Gasparetto (Vodafone)
- Pankaj.Goyal(Microsoft)
- Cédric Ollivier (Orange)
- Karine Sevilla(Orange)
- Ulrich Kleber (Huawei)
- Emma Foley (Red Hat)
- jie niu (China Mobile)
- Sridhar Rao (Spirent)
- Lincoln Lavoie (UNH-IOL)
Absent (TSC)
- Trevor Cooper (Intel)
Other Attendees
- Ildiko
- Frank Brockners
- Bob Monkman (Deactivated)
- Frank Brockners
- Trevor Bramwell
- Sandra Jackson (Deactivated)
Agenda
Time | Topic | Presenters | Notes | |
---|---|---|---|---|
5 min |
|
| ||
2 min | Announcements
| No updates. Still planned to be in person at this time. | ||
1 min |
| Note changes to TSC Planning time. | ||
15 min |
|
| ||
5 min |
| Will provide more details – postponed to next week. The lead for the project will join the TSC call. Sridhar Raois doing the work to create a project proposal. | ||
5 min |
Link to Lakelse Blog: Anuket on track for a big 2022: Lakelse release, Anuket Assured, and More | Blog for Lakelse release published, it covers Anuket Assured as well. No other updates. | ||
10 min | Release Updates
|
| ||
10 min |
| Some PRs have been opened to automate the conversion process. Right now it is done by hand which slows the conversion process down. Please do review the conversion pr-s as soon as possible. RC1 and RC2 are already converted per Cédric Ollivier The process works really well. You need to check all the links inside the doc in addition to converting to rst formatting. We should move to Matherial Sphinx theme after the first pr-s of conversion are merged. PR-s to be review-ed and merged:
| ||
5 min |
| There is interest in making doc standards across the LFN community. Best practices, common set of required docs across all the LFN projects. Cédric Ollivieris proposing to add standards tools as well. ONAP and Anuket are currently the two biggest projects. Synergy between these two projects will go a long way. | ||
5 min |
| Sub-project Leaders | No updates | |
1 min |
| No updates. Still waiting on legal review of the CLA. Still need to resolve supporting Anuket with EasyCLA – Sandra Jackson (Deactivated) will check. Anuket ICLA and CCLA EasyCLA can support GitLab. Pankaj.Goyal"If conversion not done, should we postpone move to GitLab until next release." Gergely Csatarineed to separate technical conversion from legal issues. https://anuket.io/cla/ | ||
5 min |
|
| ||
1 min | AOB |
|
s