OPNFV TSC Meeting 2020-11-24

Anuket Project

OPNFV TSC Meeting 2020-11-24

Date

Nov 24, 2020 

Attendees

  • @Al Morton

  • @Frank Brockners

  • @Qiao Fu

  • @Georg Kunz

  • @Former user (Deleted)

  • @Lincoln Lavoie

  • @Mark Beierl

  • @Emma Foley

  • @Sridhar Rao

Absent

  • @Former user (Deleted)

  • @Sunku Ranganath (Deactivated)

  • @Trevor Cooper

Non TSC Attendees

  • Add as needed

Agenda items

Time

Topic

Who

Notes

5 min

Meeting Admin

Agenda Bashing
Attendance/Quorum (8/7)
Approval of Meeting Minutes: OPNFV TSC Meeting 2020-11-17#Minutes and  IRC Meeting Minutes

@Al Morton

As agreed on Sep 15, 2020 changes to the minutes may be executed on the Agenda wiki page, with the aid of audio and text transcript available for 1 week.

5 min

Announcements !

Interim TSC Election

NEXT vDev and Test Event Feb 1-4, 2021 (no conflicts identified at TAC level)

@Al Morton

Weekly Technical Meeting Hosts:

Sept - @Sridhar Rao Thanks!

Oct - @Emma Foley Thanks!

Nov - @Georg Kunz

Dec - @Lincoln Lavoie

MEC and NFV Plugtest:

https://www.etsi.org/events/1840-nfv-mec-remote-api-plugtests-2021

20 min

OPNFV JERMA Release

Status - PTL stand-up

List of the Integration Projects and Status
AIRSHIP - removal of floating IP support in ver 1.8 issue: 2 Functest test cases XX,  – phase 2 integrate with Functest,  - CNTT conformance requires moving to Train Live Migration

CIRV - RELREQ 5 - should be able to close in a few days testing now (Sridhar)

VSPERF - RELREQ 6 and 9 nearly complete, Integration with X-testing and Openstack Functest

SampleVNF - needs to join Pod 18 work

List of the Individual Projects Releasing with OPNFV-JERMA and Status

AIRSHIP - phase1 missed workaround for Nova instance console issue

CIRV
Doctor
Barometer - a few items to get working, but then can

kuberef - one patch to review, then can merge and stable

Dovetail
FDS - withraw, upstream component not available

VSPERF
SampleVNF

Monday Tech Discuss on Anuket Release Artifacts

How do we characterize the JERMA Release Test Suite?

How do we evaluate Individual Projects w.r.t. OPNFV-JERMA release?

How do evaluate AIRSHIP delivery w.r.t. CNTT RI ??

For Reference Compliance (RC) Test Projects (Integration projects)

FINAL JERMA RELEASE GATE:

 

Links

Mapping Release Requirements into JIRA

Jerma Release Candidate RC0 scheduled for Nov 17

Establish Integration Test Team

Self-Release projects, as described in the OPNFV JERMA Release process: 

Requirements "manifest" for the Release (what is included).
Meeting Logistics 

@Al Morton

@David McBride

@Sofia Wallin

Partial list of issues discussed:

  1. Are the Definitions of Gates clear?

    1. Testing of the CNTT-selected RC Test Cases

    2.  projects must pass Gating (s 17)

    3. Gates need to be established, install without errors, simple functional tests, success of more advanced features and automated with X-testing

  2. Pre-requisites, include Integration TEST project (Morgan in ONAP), test what OPNFV delivers.

  3. OPNFV needs to Release and Support tests that are reliable.

    1. "Establish" items are the key steps for TSC: Requirements Vetting and Integration Test SCs

  4. Documentation: Jerma Requirements Working Group Assessment

PDF

 PDF

  • Sophia - Plan for Documentation of Jerma Release

    Volunteers Needed to review and update Documentation Templates for JERMA - 2 or 3 people needed.  - No longer needed ???

 

20 min

MELD Topics and status updates

Proposal for Interim Meeting Structure (first one, others possible)

Converged work-flow or Tool chain: what do we recommend?
under discussion -
shift to gitlab is a continuing discussion and evaluation

Release Naming -  in 2021?

Long live Anuket!

Interim TSC Structure (discussed at Technical Discussion)

Joint 2 hour session between Meld-ORG and Meld-OPS teams
TSC Diagram

Interim TSC Calendar Election calendar

@Jim Baker

@Trevor Cooper

@Mark Beierl

Marketing wiki for properties of melded organization: https://wiki.lfnetworking.org/display/MZ/Branding+Whiteboard

 

5 min

OVP Engagement status update

 recent status update

@Trevor Cooper

@Lincoln Lavoie

 

10 min

Gitlab Pilot

Weekly place holder update

@Trevor Bramwell

@Mark Beierl

@Georg Kunz

Notes from StorPerf migration: GitLab and StorPerf

Evaluation tracker: https://gitlab.com/gitlab-org/gitlab/-/issues/271347

0 min

OPNFV Project Reviews

  • SampleVNF Reorganizing:  Future Review!

@Jim Baker

 

5 min

Status Updates

OPNFV Linux Foundation Lab (Portland) hardware upgrade status
LF IT/Infra update: (Aric GardnerTrevor Bramwell)

@Jim Baker
@Trevor Bramwell

 

 

 

Future Topics

Future Topic: upcoming ETSI NFV&MEC Plugtest ~Feb 2021

 

  • new template concept is on hold